The solid 2×8 Studs are in the shop being updated to 2×8 EcoSmart™ Studs at our Wood Workers production facility. The stack is getting larger as the order is being readied to ship to the job site for the first Net Zero build in Addy Washington!
We are super excited about this build since Net Zero and Zero Energy Ready Homes are the future of home building. The EcoSmart™ Stud dramatically lowers the costs of these builds to the point the the future is now!
We have the added bonus of lower CO2 emissions through the entire supply chain of getting our studs to the homes they are going into.
Be part of the revolution in building! Contact us for more information at 612 887-5200 or through our contact page!